The Group of 2004 repaired the Grade One at a total cost of Rs 2.0 million. The project was made possible with the generous contributions of several benefactors. The rectification work was carried out to ensure the safety and comfort of the Grade One students while preventing water leaks during the rainy season. Coordinating members of the group supervised the work closely to ensure that the rectification work was carried out according to the required standards.